AquaGrip Case Study
Overview Case StudiesAquaGrip - Thermal Power Plant - Marseille
Client: EDF
Contractor: Cari TP Nice
Distributor: Glynwed France
Specification: AquaGrip Flange Adaptors DN350
Project: The Martigues power plant is located on the shores of the Mediterranean, 30km from Marseille. The existing power plant comprises of 4 oil fired 250mw units. Two of these are to be transformed into state of the art gas fired combined cycle units.